Project overview
Coolnet supplied containerized data-center infrastructure for Fluor, the US-based engineering and construction company. The project configuration brings racks, precision cooling and modular UPS into factory-built enclosures.
Project configuration
- Containers
- 2 × 20 ft
- Standard racks
- 4 listed in the project configuration
- Cooling
- 25 kW precision in-row cooling
- Power
- Modular UPS
Factory-integrated infrastructure
The container format combines the supporting equipment in a transportable enclosure. The documented scope covers the container system, rack infrastructure, cooling and backup power.