Project overview
A bank in Moscow was redesigning computer rooms as storage-service demand grew. Coolnet selected CyberMaster units around the existing equipment and site conditions.
Project configuration
- 30 kW units
- 14 sets
- 70 kW units
- 18 sets
- Product series
- CyberMaster precision cooling
Phased replacement
After the first group of replacement units entered operation, the customer proceeded with a second batch of air conditioners. The project retained a site-specific equipment-selection approach.